Finishing works need easy demountable metalware that enable setting scaffolding lift at a certain height. Presented scaffoldings meet these demands and are designed for finishing and repair works inside and outside of dwelling, public, and production buildings at a height up to 40 meters.
| Height, m | 7.50 |
| Length, m | 3.40 |
| Board width, m | 0.70 |
| Nominal board loading, kgs/m2 | 200.00 |
| Maximum weight, kg | 255.00 |
| Vertical elevation area of set along the wall, m2 | 25.50 |
| 1 | Scaffolding Truss 3.40 m | 2 items |
| 2 | Supporting Truss 3.40 m | 4 items |
| 3 | Ladder 2.50 m | 6 items |
| 4 | Board Support | 2 items |
| 5 | Vertical Frame | 2 items |
| 6 | Scaffolding Screw Jack | 4 items |
| 7 | Small Scaffolding Screw Jack | 2 items |